|
Post by georgemyers on Sept 23, 2021 2:01:32 GMT -5
I have my Porter Cable router and shop vac connected to two SSR's. These are getting power from one of the two front receptacles on the HS1'
I am trying to start the shop vac and router when I do a cycle start run of Mach3.
I had this working years ago, or I think I did.
Right now when I do a reset in Mach3 it will turn on the PC/sV.
I am trying to get both turned on right after I hit cycle start and stop at end of job in Mach3.
I am using a ESS Smothstepper
What I want to happen is to have power applies to the receptacles when I perform a cycle start and not a reset. I can live with having the power applies after I perform a reset but having power applied after I perform a cycle start would solve my problem.
Any suggestions would be appreciated.
|
|