kderr
New Member
Posts: 7
|
Post by kderr on Oct 2, 2013 9:34:29 GMT -5
I'm looking for instructions on how to install the MPG on a WD-1? I already mounted it! Thanks
|
|
|
Post by romaxxcnc on Oct 3, 2013 10:09:49 GMT -5
These changes should only be performed by a qualified electrical technician. If you are aren't sure, get some help with it or send us the panel.
Power the machine down and wait 5 minutes before adding the MPG connections.
On the MPG, Under 5V or Vcc connect a red wire Under 0V or GND connect a Green wire Under A connect a white wire Under B Connect a black wire
At the breakout board:
There is a 4 terminal block on the upper left corner labeled 5+, Bch, Ach, GND
Connect the red to 5+ Connect the white to Ach Connect the black to Bch Connect the green to GND
Everything should be formatted in Mach3 already for it.
-Ron
|
|
kderr
New Member
Posts: 7
|
Post by kderr on Oct 3, 2013 20:58:10 GMT -5
I opened it up again but the status light is connected to the block I think you are telling me to install the MPG? Attachments:
|
|
|
Post by romaxxcnc on Oct 5, 2013 14:54:12 GMT -5
Both can be connected under the same terminals.
-Ron
|
|
kderr
New Member
Posts: 7
|
Post by kderr on Oct 5, 2013 15:20:50 GMT -5
Ok just wanted to be sure!! Thanks Ron
|
|